Project Overview

This Grade II Listed Building (Historic England List Entry No. 1389643) project demonstrates the importance of combining heritage sensitivity with modern manufacturing and installation expertise – ensuring buildings of historic significance remain fit for the future.

  • Built in 1912 as the Great Yarmouth School of Arts and Crafts
  • Designed by J.W. Cockrill, Borough Architect of Great Yarmouth
  • Early use of steel frame and concrete construction, with red brick cladding
  • Recognised as an early example of modern construction methods in civic buildings
  • The designer was nicknamed “Concrete Cockrill” for his pioneering use of concrete

Municipal School of Art - Flagship Housing

Architectural Description

  • Two-storey steel-framed building clad in red brick with concrete and terracotta detailing
  • Designed in a restrained classical style with tripartite vertical bays and emphatic pilasters
  • Large metal-framed windows, particularly prominent on the north and east elevations, provide strong visual rhythm and natural light to former studios and classrooms
  • Features a central entrance bay with a recessed door, detailed in concrete and brick, framed by robust architectural surrounds
  • Interior includes wide corridors and high-ceilinged rooms typical of early 20th-century educational buildings
  • Externally notable for its parapets with finials, deep concrete string courses, and overall expression of early civic modernism

Municipal School of Art - Flagship Housing

The Challenge

This project presented several key challenges:

  • Heritage Constraints
  • Grade II listed building requiring strict planning approval
  • Need to retain original aesthetic and proportions
  • Limited tolerance for visible change

Architectural Sensitivity

  • Large, repetitive window bays forming the building’s identity
  • Requirement to maintain:
    • Sightlines
    • Mullion/transom alignment
    • Consistent glazing patterns
  • Occupied Building
  • Works carried out in a live residential environment
  • Resident communication and sequencing critical

Access Constraints

  • Prominent roadside elevation
  • Likely scaffold and logistics complexity (tight urban frontage)

Municipal School of Art - Flagship Housing

Our Solution

Asset Fineline delivered a fully managed solution:
Survey & Design

  • Detailed measured surveys to replicate original layouts
  • Coordination with planning / conservation requirements

Manufacture

  • Bespoke window production to match:
    • Original proportions
    • Glazing bar configurations
  • Focus on consistency across all elevations

Installation

  • Working with multiple trades – scaffold, new fans (ventilation) system installers and infrared heating installers
  • Phased installation programme to liaise with the other trades on site
  • Careful removal and replacement to protect surrounding fabric
  •  Minimal disruption to residents

Outcomes

  • Retained the visual integrity of a landmark building
  • Delivered improved thermal performance and longevity
  • Achieved planning and conservation compliance
  • Successfully completed within an occupied residential setting

 

Your browser is out of date. It has security vulnerabilities and may not display all features on this site and other sites.

Please update your browser using one of modern browsers (Google Chrome, Opera, Firefox, IE 10).

X